Ditch

Home » Virtual Sites » Ditch

The Fort Raleigh Ditch

The ditch of Fort Raleigh was divided into 34 separate sectors in order to estimate the volume of the dirt removed and given a unique sector number. These sectors were classified based on their shape as either a trapezoidal prism sector, a corner sector, or a wedge sector.

In order to obtain the minimum and maximum estimations, each sector was measured midpoint to midpoint.

Ditch Volume Equation

The Total volume was calculated by the following equation:

Total Volume of Dirt Removed = Volume Of Trapezodial Prism Sectors + Volume Of Corner Sectors + Volume Of Wedge Sectors.

Trapezoidal SectorsCorner SectorsWedge SectorsTotal
Minimum Estimate8537.76994.96848.910381.62 ft^3
Maximum Estimate101371596.5935.512669 ft^3
Maximum-Minimum2287.38

Join our email list

Stay up to date on all of the First Colony Foundations news, and be the first to hear about upcoming events!

"*" indicates required fields

Name*
Email*
Privacy*